Jones Road
Culvert Replacement - Jones Road
Overview
Site:
Jones Road
Completion Date:
February 5th 2021
![](https://d113q3lewv5kc2.cloudfront.net/images/Jones_Rd1_-_Rowan_Co.jpg@.webp)
Background
The existing culvert underneath Jones Road had reached its maximum design life and with a recent storm event the road began to sink above the pipe forcing DOT to close the road.
![](https://d113q3lewv5kc2.cloudfront.net/images/Jones_Rd2_-Rowan_Co.jpg@.webp)
Our Solution
90” diameter Corlix Aluminum pipe with Aluminum Structural Plate headwalls were designed and installed. Flanged joints were used on the pipe to insure a watertight and restrained joint connection. Installation of the pipe and both Inlet / Outlet headwalls was completed in one day.