Jimmy Kerr Road
Emergency Washout - Jimmy Kerr Road
Overview
Site:
Jimmy Kerr Road
Completion Date:
January 29th 2021
Location:
Alamance County, NC
Customer:
NCDOT Division 7 Bridge Maintenance
Applications:
![](https://d113q3lewv5kc2.cloudfront.net/images/Before.jpg@.webp)
Background
This culvert located on Jimmy Kerr Road was washout by heavy rains back in 2019. The road remained closed while a waterline was repaired that crossed over the existing structure.
![](https://d113q3lewv5kc2.cloudfront.net/images/Jimmy_Kerr_Rd_5_-Alamance_Co.jpg@.webp)
Our Solution
A19’-2” Span x 11’-9” Rise Aluminum Structural Plate Pipe Arch withAluminum headwalls was chosen to replace the failed culvert. It was built on-site in one day allowing NCDOT bridge crews to backfill the structure quickly while they worked around the rainy weather re-opening the road with in two weeks.
Full Gallery
![](https://d113q3lewv5kc2.cloudfront.net/images/Before.jpg@.webp)